Wild Wood Flower

This page comprises of several photos of relatively big size. It may take some time for loading...

Laying tracks like "Deutsche Bahn" or "Bundesbahn"...

First movements with 99 6001

When the power feedings are correct, the first trial run can be performed. Best is to use a well known loco with more than 2 axles - not too sensitive in power pick up from the tracks. Here 99 6001 (ex Harz Mountain Railways) does the first movements on the new led track. Laying tracks is very simple: Make a plain basis of bricked stone, then lay the track on the surface. Take some bricked stone and put in on the track. "Overflow" should be removed by a brushing. Wait a few days, and the bricked stone will fix the track tightly. Here the bricked stone is very bright, this will change within a few days also. The next rain will darken the stone.
 

Fine tuning with sensitive loco - the Flyer

The "Flyer" is the best tool to check the right position of the tracks finally. This machine does not accept any wrong angles / connections of the track. Therefore the "Flyer" has dumped several times - without taking harm -into the pond...
 
 

99 6001 on the track

Then you can make real traffic. The upper board of the bridge must be reworked - the sun has put too much power on it ...

Back to last page?

Back to Robert's Railway Page

Back to Robert Freidinger Homepage

Back to Family Freidinger Homepage