Wild Wood Flower

This page comprises of several photos of relatively big size. It may take some time for loading...

How to put tracks into bricked stone:

Cable channels for power feeding

On the plain bed of bricked stone the tracks are led. Power feeding wires are hiden into cable boxes. In our climate it is recommended to have avery 30 cm (2 feet) at least one feeding point, best to be solded. If you do not do this, the locos after will some months stop freqently - annoying...
 

Upper station lay out

The upper part of the main station was extended and put into some more "railway like" lay out. One bush had to be extracted. On the right hand side the cable boxes are up to now not put into order.
 

In the tunnel

This is how it happens in the tunnel. The brigde has got a new upper board - not ready up to now, but looking much better than before.
 

More photos?

Back to last page?

Back to Robert's Railway Page

Back to Robert Freidinger Homepage